Case Studies
The case studies you see here are just some examples of what our highly trained staff are capable of. Each of these projects have been successful, not only because of the experience each company has brought with them, but also because of the high standard of professionalism shown by the companies we have partnered with.
Rio Tinto Mission River Bridge
Metal Protection Systems
Sealing of Gas Bores
Strengthening Pier 10 of The Burnett River Bridge
Deep Crack Injection
Ground Stabilisation Using Thixotropic Epoxy Resins
Projects
The case studies you see here are just some examples of what our highly trained staff are capable of. Each of these projects have been successful, not only because of the experience each company has brought with them, but also because of the high standard of professionalism shown by the companies we have partnered with.
Ayr Bridges Bearing Rehabilitation
Bicentennial Bikeway Bearing Replacement
Biloela Reservoir Remediation
CFRP Strengthening - 3 Bridges
Culvert Structural Remediation
Herbert River Rail Bridge Strengthening
Waterproofing of Karana Downs Reservoir Joints and Floor
Kuranda Station Turntable
Legacy Way Tunnel
QR Culvert Strengthening and Repair
Russel River and Josephine Creek Bridge Bearing Rehabilitation
Russel Terrace Bridge Bearings
Springfield Reservoir Remediation
Tom Simpson Park Pedestrian Bridge
Bridge 18 Toowoomba Second Range Crossing Repairs
Worley Lane Reservoir Remediation
Get in touch
We aim to meet or exceed Internal and External Customer Expectations by providing superior Workmanship and Services.